Standard canopy sets often fail when flexibility matters and power demands are high. In these scenarios, off-the-shelf solutions aren't just inadequate-they're a liability. Many UK facilities face this exact dilemma: they need significant power capacity but lack the flexibility and the mobility with traditional generator installation.
Shipping containers, basement plant rooms, and rooftop installations all present constraints that standard equipment cannot solve. You're left with impossible choices: reduce power capacity, modify your building structure at massive cost, or accept inadequate backup power.
Our bespoke engineering team specializes in containerised twin-sync systems. Two 130 kVA parallel units housed within a single 20ft ISO container create a compact powerhouse offering redundancy and sustained output that a single larger unit cannot match. This configuration delivers 260 kVA of total capacity with a staggering 65 dBA @ 1m sound level.
The containerised advantage:
This bespoke approach solves power challenges that generic solutions simply cannot address. We've deployed containerised systems across the UK and internationally, each engineered specifically for its location.