Containerised Power: The Smart Solution for Restricted Sites

Containerised Power: The Smart Solution for Restricted Sites

Basements, rooftops, remote locations, and sites with no available plant room all present installation challenges that standard equipment cannot solve. Containerised generator systems can.

When Standard Installation Is Not an Option

Not every site has a dedicated plant room with convenient access, adequate ventilation, and straightforward cable routes. Restricted urban sites, temporary installations, phased developments, and remote locations all present challenges that require a different approach.

Containerised generator systems are purpose-built for these situations. The generator, fuel system, controls, and ancillary equipment are all housed within a weatherproof, secure enclosure that can be positioned almost anywhere and connected to the site's electrical infrastructure.

The Advantages of Containerised Systems

  • Flexibility - can be positioned on rooftops, in car parks, on temporary sites, or in locations where a conventional plant room is not feasible
  • Relocatability - containerised systems can be moved if site requirements change
  • Security - robust steel enclosures with access control protect equipment from theft and vandalism
  • Weatherproofing - suitable for outdoor installation without additional civil works
  • Scalability - multiple containers can be deployed in parallel as demand grows
  • Speed of deployment - factory-built and tested before delivery, reducing on-site installation time significantly

Twin-Sync Containerised Systems

For high-demand applications requiring N+1 redundancy in a compact footprint, EA Power Systems designs twin-sync containerised systems. Two generators within a single enclosure operate in parallel, sharing the load and providing redundancy without requiring separate plant rooms or complex civil works.

Built and Tested Before Delivery

Every containerised system EA Power delivers is fully assembled, wired, and load-tested at our facility before it leaves for site. This means the commissioning process on site is faster, cleaner, and more reliable than a system assembled in the field.